Tunnel-type ladder on the left side from the floor to the crown block

1 set

 

 

 

 

Stairs on the right side from the floor to the monkey board

1 set

 

 

 

1.2.5

Buffer device

Wooden covered with metal sheets

1 set

 

 

 

1.2.6

Set of support frames for derrick assembling in horizontal position

 

1 set

 

 

 

 

Jack of specified height for mounting, not regulated with openings for a loader

 

2 ea

 

 

 

 

Regulated jack with openings for a loader

 

1 ea

 

 

 

1.2.7

Set of equipment for erection of the, substructure and drawworks

 

1 set

 

 

 

 

Set of lifting eqipment for the derrick erection

According to specifications API 9A

1 set

 

 

 

 

Traveling block suspension device for drill line system rig up

 

1 set

 

 

 

 

Frame lifting eyes for derrick erection

According to specifications API 8C

1 set

 

 

 

1.2.8

Device for suspension and balancing of equipment

According to "Safety in the oil and gas industry of Ukraine" NPAOP 11.1-1.01-08. All suspended pulleys must be safe and have protection against falling of pulley elements and safety slings

1 set

 

 

 

 

Deflecting pulley for the auxiliary winch of the Rig floor

2 ea

 

 

 

 

Hanger for power tongs

2 ea

 

 

 

 

Balancing arm of power tongs

2 ea

 

 

 

 

Pendant for automatic drilling tongs

1 ea

 

 

 

 

Brackets for hanger of service equipment

1 ea

 

 

 

1.2.9

Dead line Stabilizer

 

1 set

 

 

 

1.2.10

Stabilizer of the fast line




1 set

 

 

 

1.2.11

Manifold

35,0 МПа (5000 psi)

1 set

 

 

 

 1.2.11.1

Stand pipe




1 set

 

 

 




Internal diameter

127 mm (5'')
















Internal pressure at least

35.0 MPa (5000 psi)













 

Fastener clamps

 

1 set

 

 

 

 1.2.11.2

Valves

5”

1 set

 

 

 




Additional internal pressure at least

35.0 MPa (5000 psi)













 1.2.11.3

Pressure gauge

35.0 MPa (5000 psi)

1 ea

 

 

 

1.2.12

Safety elements

 

 

 

 

 

 

Wind indicator

 

1 ea

 

 

 

 

Signal lights on the crown block

Сonsists of (at least) two lights. One of them receives power from an independent power supply (solar panel and battery) Battery capacity enough at least for 12 hours of operation)

1 set

 

 

 

2

Deadline anchor

 

1 set

 

 

 

2.1

Main technical specifications

 

 

 

 

 

2.1.1

Version according to the standard, specifications

API 8C-2012.
Category of design of products PSL:PSL-1.

 

 

 

 

2.1.2

Line diameter

35mm

 

 

 

 

2.1.3

Maximum tension of the deadline at least

400 kN

 

 

 

 

2.2

Weight indicator

 

 

 

 

 

2.2.1

Type

Martin Dekker or similar

1 ea

 

 

 

3

Substructure

 

1 set

 

 

 

3.1

Main technical specifications

 

 

 

 

 

3.1.1

Version according to the standards, specifications

API Spec 4F-2013 with monogram of API,
Category of safety of construction SSL :E2 and U2,
Category of design of products PSL:PSL-1

 

 

 

 

3.1.2

Design of substructure

Swing Lift (SL)

 

 

 

 

3.1.3

Rig floor height from the ground level at least

9 m

 

 

 

 

3.1.4

Clear height from the ground level to rotary beams at least

7 m

 

 

 

 

3.1.5

Maximum static load on the substructure at least

320 t

 

 

 

 

3.1.6

Maximum static load on the setback at least

200 t

 

 

 

 

3.1.7

Dimensions of the rig floor, at least

12 × 11 m

 

 

 

 

3.1.8

Capacity of the setback(stand 28 m long) stands, at least

5″ DP - 170 stands,
9″ DC - 2 stands,
8″ DC - 6 stands.

 

 

 

 

3.1.9

Requirements to rig floor cover

Antislip coating in hazardous areas.
Coating of the floor: corrugated sheet thickness at least 8 mm

 

 

 

 

3.2

Substructure components

 

 

 

 

 

3.2.1

Auxiliary winch

Equipped with a cable laying device

2 ea

 

 

 




Lifting capacity at least

5 t
















Cable length at least

120 m













3.2.2

Post of fastening of the cable end of the manual power tongs

 

2 ea

 

 

 

3.2.3

Support for pipe tongs

 

1 ea

 

 

 

3.2.4

Support for hydraulic fastening device

 

1 ea

 

 

 

3.2.5

Rathole

 

2 ea

 

 

 

3.2.6

Inclined chute for evacuation

 

1 set

 

 

 

3.2.7

V-door ramp

Wedge limiter for pipes

1 set

 

 

 

3.2.8

Stairs with handrails for ascending the rig floor (left, central and right with stairs to the shale shakers)

According to "Safety in the oil and gas industry of Ukraine" NPAOP 11.1-1.01-08

3 sets

 

 

 

3.2.9

Windbreak including sliding doors for access. Height at least

6 m

1 set

 

 

 

3.2.10

Folding protection doors on hinges before the V-door ramp for pipes

 

1 set

 

 

 

3.2.11

Drainage system for collection of liquid leaks from the pipe setback zone, rotor table zone

 

1 set

 

 

 

3.2.12

Pipe setback zone (made from hardwood) thickness, at least

200 mm

1 set

 

 

 

3.2.13

Doghouse on the rig floor

 

1 set

 

 

 

 

Workshop on the rig floor

 

1 set

 

 

 

3.2.14

BOP manipulation system

 

1 set

 

 

 

 

Version according to the standard, specifications

API Spec 7K-2010 5th Edition

 

 

 

 

 3.2.14.1
1   2   3   4   5   6   7   8   9   ...   30

Схожі:

Public joint stock company "ukrgasvydobuvannia"

Public joint stock company "ukrgasvydobuvannia"

Public joint stock company "ukrgasvydobuvannia"

Public joint stock company "ukrgasvydobuvannia"

Public joint stock company "ukrgasvydobuvannia"

Agreement with the member of the supervisory board of public joint-stock...
Договір з членом наглядової ради публічного акціонерного товариства "страхова компанія "євроінс україна"

To: Public Joint Stock Company “Kreditprombank”, 38, Boulevard Druzhby...
Публічне акціонерне товариство «Кредитпромбанк» 38, бульвар Дружби народів, 01014 м. Київ, Україна

Public Joint Stock Company «Ukrgasvydobuvannya»
«Ukrgasvydobuvannya», represented by commercial director Sergey Fedorenko, acting on the basis of the Power of Attorney №2-406d dated...



База даних захищена авторським правом © 2020
звернутися до адміністрації




blanki-ua.com.ua


Головна сторінка

Бланки резюме
Бланк довіреності
Бланк заяв
Заява зразок
Договір розірвання
Зразок позовної заяви
Заява на паспорт